General Information
You must supply adequate combustion and ventilation air to
this pool heater. You must provide minimum clearances for the
vent terminal from adjacent buildings, windows that open, and
building openings. Follow all requirements set forth in the
latest edition of the National Fuel Gas Code, ANSI Z223.1, in
Canada, the latest edition of CAN/CGA Standard B149
Installation Code for Gas Burning Appliances and Equipment
or applicable local building codes. Vent installations for
connection to gas vents or chimneys must be in accordance
with Part 7, “Venting of Equipment” of the above-mentioned
standards.
IMPORTANT: Examine the venting system at
least once each year. Check all joints and vent
pipe connections for tightness. Also check for
corrosion or deterioration. If you find any
problems, correct them at once.
Venting Support
Support horizontal portions of the venting system to prevent
sagging. Provide an upward slope of at least 1/4 inch per foot
(21mm/m) on all horizontal runs from the pool heater to the
vertical flue run or to the vent terminal on sidewall venting
installations.
Do not use an existing chimney as a raceway if another
appliance or fireplace is vented through the chimney. The
weight of the venting system must not rest on the pool heater.
Provide adequate support of the venting system. Follow all
local and applicable codes. Secure and seal all vent
connections. Follow the installation instructions from the vent
material manufacturer.
Vertical Vent Termination Clearances
and Location
The vent terminal should be vertical and exhaust outside the
building at least 2 feet (0.61m) above the highest point of the
roof within a 10 foot (3.05m) radius of the termination.
The vertical termination must be a minimum of 3 feet (0.91m)
above the point of exit.
A vertical termination less than 10 feet (3.05m) from a parapet
wall must be a minimum of 2 feet (0.61m) higher than the
parapet wall.
You must locate the air inlet termination elbow at least 12"
(30cm) above the roof or above normal snow levels.
Keep the vent cap clear of snow, ice, leaves, and debris to
avoid blocking the flue.
Figure 10 – Vent Termination from Peaked Roof - 10' or
Less From Ridge
IMPORTANT: Vent terminations are not shown in
Figures 10, 11, 12, and 13. Make sure all vertical
vents are installed with vent terminations
recommended by the vent manufacturer.
Figure 11 – Vent Termination from Peaked Roof More Than 10'
From Ridge
Commercial Pool Heaters
10
Page view 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 59 60

Comments to this Manuals

No comments